c

1979 CESSNA CITATION ISP EAGLE II

Details

General Specs

For Sale

1979

CESSNA CITATION ISP EAGLE II

C-FBDQ

501-0097

Edmonton, AB CAN


General Specs

8,512

1,794 SNEW

1794 SNEW

Used

2015

2017

N/A


Additional Classifications


Detailed Description

1979 Citation I/SP Eagle II, 8512 TTAF, 1400 hrs since Sierra mods/ rebuild in 2006, TAP Blue, no damage, professionally flown, complete logs. Canadian Registered, Always Hangared, Paint & Interior Show well.

Avionics / Equipment

Avionics:
Sperry SPZ-500 IFCS / Garmin Set up
Garmin GNS-530AW /WAAS & GNS-430A Nav/ Comms/GPS/ TAWS
Garmin GTX-330 Mode S Transponder
Sherry SPZ-500 IFCS 5-inch 2-tube Flight Director
Collins DME 40
Collins RMI
Garmin MX Multi-function display
BFGoodrich WX-500 Stormscope
BFGooddrich SkyWatch HP SKY-899 TCAS
Weather Radar: Honeywell RDR-2000VP color
Radar Altimeter
WAAS equipped

Additional Equipment:
Sierra Williams FJ44-2A engine upgrade
Sierra Eagle Wing Conversion SA645NW
Sierra Gross Weight increase SA 732NW
Sierra Williams Rolls ST09559AC
Garrett RVSM A0163CH
Single Pilot Operation SA00-47
Gill Lead Acid Battery
Aft Cabin Baggage Compartment Seats SA19RM
Retractable Recog Lights SA1013CE
Sierra Control Wheel Transponder Switch SA502NW
Sierra Avionics Master Switch SA091095C
Factory Installed Freon Air Conditioning
Sierra Radome Modification
Sierra Glare shield Modification
Aluminum dorsal Fin Modification

Airframe

Airframe Time: 8,512 hrs. 
Cycles: 7,536

Engines / Mods

Engines: Williams International FJ44-2A (Tap Blue- best available)
Serial Number: 116037 116036
TTSN: 1,794 hrs. 1,794 hrs.
TBO: 3,216 hrs. 3,216 hrs.
Time to next HSI 608 hrs. 608 hrs.

Interior / Exterior

Interior & Paint:
7 Place Executive Configuration
Light Tan Leather Interior (2006)
Option to remove 7 th seat for additional refreshment cabinet
Overall White with Blank accent striping
New Paint 2006, touch ups completed in 2012, always hangared
Interior refurb in June 2016

Remarks

2020 ADSB Compliant
Phase 1 300 hrs / 24 M Completed– June. 2018
Phase 2 300 hrs / 24 M Completed– June. 2018
Phase 3 300 hrs / 24 M Completed– June. 2018
Phase 4 300 hrs / 24 M Completed– June. 2018
Phase 5 1,200 hrs / 36 M 9,370 hrs – December 2017

**Virtually no maintenance due for 2 years as Phase 1-4 and Phase 5 have been completed all within past 7 months!

For More Info, vist this listing on our website at: https://www.rightjets.com/business-jet/citation-501-williams-engines-upgrade-2006/

Contact Info

Back