This modern 100' x 120' hangar was completed in June 2025.
- Fully heated with in-floor radiant heat
- LED lighting
- The hangar features a PowerLift hydraulic door for smooth, reliable operation (87'6"wide X 21'6"tall)
- South Facing
Located on the main airport apron for easy access.